This project consist of fire prevention repairs flow test ramp underground hydrants,
repair wet pipe sprinkle system bldg. 141, troubleshoot & repair mass notifications
bldg. 107, replace monaco fire alarm panel bldg. 120, replace fire alarm panel
bldg. 142, replace 22 carbon monoxide detections in bldg. 420, replace missing
heat detectors in bldg. 130, repair mass notification system and booster panels in
bldg. 407, purchase & install sprinkler escutcheons in multiple areas in bldg. 421,
and purchase/install missing smoke detectors in bldg. 421. . This project will take
place in the following buildings at the 130th ANGB 107, 130, 141, 142, 407, 420,
and 421. Please reference the attached Statement of Work, Solicitation and Drawings. Regarding Zone 420 zone list, if a new panel is installed, it will need to conform to UFC-3-600-01.