This Statement of Work (SoW) defines requirements for the completion of project to replace two 12,470v to 480v transformers and install a 200A panelboard located in Building 27497 on Kirtland Air Force Base (KAFB). Replace the two current transformers like for like and associated equipment and wiring as necessary to reconnect to and from existing equipment and power.The two transformers are in building 27497. The first transformer is for stepping up power from 500KW generator feeders from 480 VAC to 12470 VAC to power buildings 27496, 27494, and 27497. The second transformer is for stepping down 12470 VAC to 480 VAC to power buildings 27497, 27492, 29081, 29082, and 29083. The transformers are outdated and are from original construction of building. The two transformers are in building 27497. The first transformer is for stepping up power from 500KW generator feeders from 480 VAC to 12470 VAC to power buildings 27496, 27494, and 27497. The second transformer is for stepping down 12470 VAC to 480 VAC to power buildings 27497, 27492, 29081, 29082, and 29083. The transformers are outdated and are from original construction of building.