The proposed work on this project consists of providing power (480V, 60 Hz, 200-300 amp) for equipment
(Hydraulic Mule) and requires installation of Skyko smart safety panel and running electrical wire. Install/change to
300 amp breaker in Bld. 407, room 149. Run conduit 4” from room 149 through hallway ceiling to hangar, using
hangers located inside of hangar (350 ft). Mount control panel supplied by the 130th. Pull wire and make all
connections for completion of job. Contractor is responsible for providing all equipment, personal or rented.
Contractor will be responsible for removal and disposal of all demolition debris or materials at an off-base location
in compliance with all State and Federal and local regulatory guidelines. Reference attached solicitation, which includes Statement of Work.