- Investigate and repair existing prep sink floor waste drain line.
- Determine the depth and area of the waste drain line that will need to be exposed and repaired.
- Locate all utilities prior to performing the work.
- Cut and dispose of exiting floor tiles as needed.
- Cut and remove and dispose of exiting concrete and debris to expose broken drain line.
- Clean out of any buildup and debris thru the accessible cleanout and access pit.
- Perform camera inspection to locate any problems areas that will impact future drainage.
- Provide written documentation based on findings.
- Install new waste drain line to match exiting with proper bedding material.
- Install new concrete bed 1/4 “below quarry tile for thin-set mortar bedding
- Install new quarry tile to match existing.
For site visit contact: Charles Ahnee (808) 291-8457charles.f.ahnee@uscg.mil
4/8/2024 :updated close date to allow site visits
4/11/2024: added Q/A RFI responses, extended solicitation period to close 4/17/2024 10:00 HST