Specifications include, but are not limited to:The Work consists of: ORG 306 – Solar Preparatory School for Girls at James B. Bonham - Project consists of the following; The work will include additions and alterations to the outdoor play spaces as well as pedestrian access routes on the campus. Minor demolition of building components includes concrete porch and steps, handrails, windows, ceilings, lockers, finishes, and equipment to make way for new construction and new building components. New interior construction, modifications, and finishes will include; gypsum board on metal stud enclosures, 2x2 lay-in ceilings, carpet, vinyl composition tile, paint, ceramic tile patch and repair, casework, and a portable platform. Modifications to the existing HVAC, electrical and communications systems will be a part of the work