U.S. GOVERNMENT
General Services Administration (GSA) seeks to lease the following space:
State:
Tennessee
City:
Nashville
Delineated Area:
North: Murfreesboro Pike
South:I-24
East: Donelson Pike & Harding Place
West: Briley Parkway
Minimum Sq. Ft. (ABOA):
5,904
Maximum Sq. Ft. (ABOA):
5,904
Space Type:
Office
Parking Spaces (Total):
2
Parking Spaces (Surface):
2
Parking Spaces (Structured):
0
Parking Spaces (Reserved):
0
Full Term:
120
Firm Term:
60
Option Term:
N/A
Additional Requirements:
N/A
Offered space must meet Government requirements for fire safety, accessibility, seismic, and sustainability standards per the terms of the Lease. A fully serviced lease is required. Offered space shall not be in the [1-percent-annual chance/0.2-percent-annual chance] floodplain (formerly referred to as [“100-year”/“500-Year”] floodplain).
Entities are advised to familiarize themselves with the telecommunications prohibitions outlined under Section 889 of the FY19 National Defense Authorization Act (NDAA), as implemented by the Federal Acquisition Regulation (FAR). ). For more information, visit: https://acquisition.gov/FAR-Case-2019-009/889_Part_B.
************************************************************************************************
Offers Due:
5/3/2024
Occupancy (Estimated):
4/1/2025
Electronic Offer Submission:
Offers must be submitted electronically through the Requirement Specific Acquisition Platform (RSAP), located at https://lop.gsa.gov/rsap/.
Interested parties must go to the RSAP website, select the “Registration” link and follow the instructions to register. Instructional guides and video tutorials are offered on the RSAP homepage and in the “HELP” tab on the RSAP website.
Solicitation Number:
Solicitation (RLP) Number
3TN0295
Government Contact Information (Not for Offer Submission)
Lease Contracting Officer
678-640-9097
Tyrekca.miller@gsa.gov
Note: Entities not currently registered in the System for Award Management (SAM.gov) are advised to start the registration process as soon as possible.
An offeror checklist has been included with the RLP to underscore the documents that may be required by this RLP. Detailed requirements are contained in the RLP. In the event of an inconsistency between this checklist and the RLP, the RLP is the authoritative source.