The Contractor shall install one new/required parts (to include the Condensing Unit and the Evaoprator Cooler) and make the Walk-cooler unit in Room 303A operational.
The Contractor will provide and install parts for the cooler unit.
Provide and install a Penn A421 series electronic temperature control with off cycle defrost (per manufacture recommendations) on the cooler unit.
Contractor will assess Government supplied parts and provide any additional parts required for full refrigeration operations.
Contractor supplied parts will be manufactured by Copeland/Emerson, or equivalent quality:
LEL0115AS6AMAB0000 UC L LP AIR 2F 15 1PH M STD S 1 FORM LCA6110AB & LCA 6110AEB
M6WF-0125-TAC-020 WATER COOLED 404 3 PH
A19 ABC24 Remote bulb 830/100F Remote bulb Temp. Control; -30/100F DIFF 3-12 Adj. 8’ Cap SPDT Nema 1 3/8 X 4” bulb
ME68 130 HP 3/8 Solenoid
MKC1-120-volt Solenoid coil
SBFSEAC 3X40DF 30 balance Port with Removable strainer 30” Cap
SA13S Sight glass, 3/8 ODF
CO53S Drier 5 Cu in 3/8 sweat
Site visit will be held at:
PNW Northwest Research Station
3200 SW Jefferson Way, Corvallis, OR 97331
Tuesday March 26, 2024 at 10:00 AM PST.
This will be the only day we will have a site visit.
POINT OF CONTACT FOR SITE VISIT:
David Oldenburg
Telephone No. 541-750-7224 or email address: david.oldenburg@usda.gov