Scope of Work:
The work to be performed under the terms and conditions of this contract consists of furnishing all plant, labor, equipment, instruments, materials, transportation, quality control, equipment, testing services, and incidentals necessary to perform a one-time inspection, report, and repair for two (2) each industrial waste tanks. The work shall be considered complete when it is finished and ready for use by the Government. The Contractor shall be responsible for field verification to verify measurements and identify any unfavorable conditions and additional work elements required. All work shall be In Accordance With (IAW) the most current publications of UFC 3-190-06, UFC 3-460-03, UFC 3-501-01, UFC 3-520-01, UFC 3-570-01, UFC 3-570-06, Tinker Air Force Base (TAFB) Standards, TAFB Specification 00 71 00, and the National Association of Corrosion Engineers (NACE) industry standards.
Work locations are:
Building 62501W (1 tank)
Building 62501E (1 tank)