Contractor shall install and maintain a minimum of 200 Mb Upload/200 Mb download speed dedicated international access internet Point of Presence (POP) for the following (7) locations on the following date(s):
Fort Magsaysay (ATEF) - 15 MAR - 15 JUN 2024 - Location (15.437844°, 121.087422°)
Fort Magsaysay, Airfield Hangar - 15 MAR - 15 JUN 2024 - Location (15.432794°, 121.086920°)
Fort magsaysay Soccer Field - 15 MAR - 15 JUN 2024 - Location (15.42317°, 121.08048°)
Camp Aquino, Tarlac - 01 MAR-22 SEP 2024 - Location (15.444033°N, 120.593510°E)
Fort Magsaysay ERC - 01 MAR - 22 SEP 2024 - Location (15.436705°N, 121.086270°E)
Basco - 01 APR - 25 JUN 2024 - Location (TBD, TBD)
Loag - 01 APR - 22 SEP 2024 - Location (TBD, TBD)
The contractor will be responsible for providing DHCP enabled service for a Class C range of IP Addresses utilizing DNS and associated 48 port switches per location (reference PWS) capable of support 110v or 220v power. Administrator login and passwords will be required for the modem, routers, and switches as required. Internet access MUST allow ".mil/.com/.gov" domain access. The contractor shall provide 24/7 on call technical support with a four (4) hour site response time for all sites for any outages. Minimum acceptable availability uptime to the customer shall be no less than 95%.The customer shall be responsible for end user support to include installing networking cable and equipment.