Description of Services:
All labor, materials, equipment, commissioning, supervision, and all other resources necessary to perform services required for the following work:
- This project will replace interior and exterior lighting for the reduction of Energy usage, and productivity improvement. New lighting will include the utilization of lighting sensors as appropriate. Areas that will have priority for new light fixtures include but not limited to: areas currently illuminated 24 hours, hallways, stairways, and areas without lighting controls. The project will require the design professionals to determine the need to replace lighting based on initial meetings with the VA, followed by subsequent development of drawings and specifications for construction of a complete stand-alone project. A/E Design team will determine existing conditions, performing field verifications as necessary.
- Background: The VA SORCC, (Southern Oregon Rehabilitation Center & Clinics), has already completed various projects throughout the site to replace lighting with Energy efficient lighting and provide appropriate lighting sensors as part of larger building replacement type projects. This project concerns Energy efficient lighting as the major component.