Revision #3 Chanded due date and time to 25 Sept 2023 2:00PM Mountian Time
Revision #2 Update the SOW and Combo Synopsis/solicitation
Revision: This revision updates the SOW to include pictures of current location and future location.
The purpose of this Project Mylar Relocation is to relocate Mylar drawings from building 1218 to 1237 at Hill AFB Utah. All work shall be conducted in accordance with (IAW) this Statement of Work (SOW).
The Government’s has a current lot of miscellaneous Mylar drawings currently stored in building 1218. All the drawings need to be relocated to building 1237. This requires that the room in building 1237 be cleaned out, including removal and disposal of old cubical office furniture. Once the new location is cleaned out, new shelving must be purchased (by the contractor), assembled and fitted to the new location. Once complete, the Mylar drawings all need to be moved, in their current configuration, to the new shelves in building 1237.