The following parts are required for 55 LRS Vehicle Maintenance to replace the winch system on a wrecker vehicle that was damaged during airfield operations. No contract labor or installation is required.
Market research found two manufacturers that could meet the requirement for the primary components, however other manufacturers may be acceptable if they meet the minimum requirements. The vehicle and existing equipment description:
Vehicle description: International Chassis, Model 4400 4x2, Reg #07C0004
Wrecker System Brand (existing): Jerr-Den
Parts to be purchased:
Qty Item Description
2 EA Planetary Winch rated for 16000 lbs. (minimum)
Known acceptable Parts: Jerr-Den P/N: 5011001147414 or JLG P/N: 1001147414
2 EA Port Relief Valve 2100 PSI
Known acceptable Parts: Jerr-Den P/N: 5011001151407 or JLG P/N: 1001151407
2 EA 0.5-in x 150-ft Steel Core Winch Cable w/5-Ton Alloy Swivel Hook
(non-specific)
*All parts proposed must be compatible with each other and the vehicle/wrecker system.
Questions for solicitation are due on or before 06 September 2023.
Quote Submissions: Quotes are due no later than Wednesday, 13 September 2023 at 4:00 PM CST.
Quotes will be submitted by email to craig.johnson.37 @us.af.mil.
Offerors are responsible for verifying receipt of their quotes to this officer before offer due date and time.
---BREAK---
13 September 2023
This solicitation is being amended to extend quote deadline from 13 Sep @ 4 pm to 15 Sep @ 4 pm.
Please see updated -1 and SF 30 Solicitation amendment.