Combined Synopsis/Solicitation:
Red River Work Center-Wastewater Electrical Distribution and Solenoid Valve Project: Work for this project consists of providing labor and materials for the removal and disposal of the sewer distribution vault piping, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and installation of new electrical wiring and custom control for valve operation. The work includes but is not limited to furnishing and installation of equipment and providing all labor in the general trades of work: site work, excavation, trenching and backfill, piping laying, electrical equipment installation, epoxy painting, and other related trades.
The project location from Grangeville, Idaho: The project is located approximately 45 miles east on Hwy 14 toward Elk City. Turn right onto the Red River Road NFSR 222 heading south for 10 miles to the Red River Administrative Site. See construction drawings for the location of the project site.