The project consists of rebuilding the Dardanelle-Structure 87 portion of the Tap to Dardanelle 161kV transmission line. The Contractor shall remove all existing conductor, Optical Ground Wire (OPGW), and overhead ground wire with associated hardware and rebuild with all new materials. The total length of the rebuild is approximately 19.59 miles.
Amendment 0001 adds a Q&A document and corrected the site visit date in Section L.07 as posted to FedConnect. The date listed in L.07 as posted to SAM was correct. The site visit date is Tuesday, August 15, 2023 at 10:30 AM CDT at the Dardanelle Dam Switchyard.
Amendment 0002 adds a Q&A document, Site Visit Sign In Sheet, Commercial Aviation Services Accepted Operators List, and Google Earth file.
Amendment 0003 adds a Q&A document and instructions for participating in the public bid opening via Microsoft Teams.