AMENDMENT 0001 - AUGUST 4TH, 2023 - THE PURPOSE OF THIS AMENDMENT IS TO DOCUMENT THE SITE VISIT HELD ON JULY 31ST AND PROVIDE ANSWERS TO QUESTIONS. ASBESTOS AND LEAD REPORT IS ALSO INCLUDED ALONG WITH SITE PICTURES. STATEMENT OF WORK IS ALSO CLARIFIED TO MAKE THE CONCRETE SLAB REMOVAL A SEPARATE OPTION. OFFER DUE DATE IS EXTENDED UNTIL AUGUST 11TH, 2023 AT 1700 (MT).
AMENDMENT 0001 ATTACHMENTS LIST:
1240LT23Q0099.0001 - MISSOULA FIRE LAB PUMP HOUSE 7 DISPOSAL (3 PAGES)
AMENDMENT 0001 - (REV 2) J.2 STATEMENT OF WORK (6 PAGES) - INCLUDES SITE PHOTOS AND CLARIFIES THE OPTIONAL ITEMS.
AMENDMENT 0001 - Shed 7 Asbestos and LeadReport- Shed 7 - Full Report
PROJECT NAME: Missoula Fire Lab Pump House 7 Disposal
DESCRIPTION OF WORK: The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work listed. Work includes the removal of asbestos from Pumphouse #7 located within the Missoula Fire Lab, with
optional building demolition. The pumphouse is a 224 sq. foot building on a concrete foundation with sheet metal exterior walls and a sheet metal roof over a concrete structure with metal framing.
PROJECT LOCATION: Pumphouse #7 is located within the Missoula Fire Lab. It currently houses the miscellaneous grounds keeping equipment. It was constructed in 1960 and was decommissioned due to connection of the facility to public water
supply, thus rendering the well pump unnecessary. (MISSOULA COUNTY, MT)
SITE VISIT SCHEDULED? YES, SEE SECTION L.
OFFER SUBMISSION INSTRUCTIONS: SUBMIT PROPOSALS TO WESTLEY.BISSON@USDA.GOV. DO NOT MAIL YOUR
PROPOSALS.
MAGNITUDE OF CONSTRUCTION: UNDER $25,000