Project involves renovations to the existing 55,105 s.f. school and the Addition of a 197 s.f. Fire Pump Room attached to the existing building. Renovations include removal of the existing suspended ceilings, installation of a new fire suppression system, and new suspended ceiling system throughout most of the building. Existing lighting and ceiling devices will be salvaged and re-installed within the new ceiling system. Site improvements include providing new water main piping for the new sprinkler and fire pump system. Exterior improvements include selective removal of aluminum gutter, wood cornice and related blocking and replacement with new blocking, aluminum cornice and gutter. Additional interior renovations include selective door hardware replacement, removal and replacement of existing pvc tile flooring and underlayment with new pvc flooring and compatible underlayment for the original 1930’s portion of the school (approximately 13,200 s.f.). MEP renovations include electrical panelboard and circuit improve-ments, replacement of two roof mechanical units located over the gym/cafeteria with new RTU units and sound attenuation curbs and related structural reinforcement of the supporting bar joists. MEP improve-ments also include demolition of two air handing units and related ductwork, and installation of a new VRF system, condensing unit and radiant heating for the administration area. No additional specifications were given.