Amendment 3: The purpose of this amendment FA302223R000700002 is to change the period of perfomance from mandatory to negotiable. All other terms and conditions remain unchanged.
Amendment 2: The purpose of this amendment is to change the period of perfomance on SF 1442 solicitation number FA302223R0007 to 120 days. Additionally as-builts have been added to the drawings file available by request and will be droppped of via DoDSAFE. The proposal due date has been changed to COB CST Monday 31 July 2023.
Amendment 1: The answers to RFIs submitted through 18 July 2023 have been posted in the attachments. The Solicitation has been changed to reflect an extention to the Proposal Due Date by 4 calendar days from 20 July 2023 to 24 July 2023. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email.
The subject requirement is to Repair Corrosion Control Fire Suppression System at B262. The Contractor shall provide all plant, labor, equipment, transportation, and tools required to demolish and install new fire suppression systems, sprinkler heads, and piping. In addition, the Contractor shall perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
IAW Air Force Controlled Unclassified Information regulations all pertinent drawings are by request only, and will be sent Via DoD SAFE.
The Government is offering a site visit opportunity on 13 July 2023 at 11:00 AM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 4:30 PM CST on Tuesday, 11 July 2023. If you do not contact the POC by 4:30 PM CST on 11 July 2023, you will not be able to attend the site visit. All RFIs must be submitted NLT 11:59 PM CST on 17 July 2023.