Amendment 02, 30 Jun 2023
- Information in this amendment supercedes any contradicting information anywhere else in this solicitation.
- Pole survey was completed and determined there are no usage restrictions on designated poles. Survey results will be made available to awardee.
- An additional questions period will run from 30 June at 1200 MDT through the 12 July at 2300 MDT.
- The Fiber optic equipment requirement is:
- 3 each of Netgear M4300-24X24F (XSM4348S) - 24x10G and 24xSFP+ Managed Switch
- Each switch will need 4 each (12 total) of SFP+ Transceiver 10GBASE-LR (AXM762) installed at the three buildings specified in the previous amendment.
- This is not a brand name requirement, alternate equipment will be considered so long as it meets the specifications of the model and options above.
--------------
Amendment 01, 14 Jun 2023
- Quote due date extended to 28 Jul 23.
- Federal Acquisition Circular version and date updated to 2023-04, 2 Jun 2023.
- Site Visit comments updated.
- Questions due date extended to 20 Jun 23.
- Attachment 4, Class Deviation 2023-O0002 updated to most current Revision.
- Statement of Work substantially updated. Added responses to 29 questions received as a result of the site visit. Additional information will be provided in a future amendment.
- Changed duration that quotes/offers must be valid after the quote due date within Provision 52.212-1 from 60 days to 45 days.
--------------
The 846 TS at Holloman AFB, NM, is seeking a new fiber optic cable (FOC) system creating a network connecting Tula Peak, the ARC (Bldg 1625), TDC (Bldg 1161), Survey Shop (Bldg 1160), 400K gallon water tank, and Bldgs 1174 and 1179. Total length is roughly 12 miles. Most of the FOC will be ran in existing conduit through pull boxes along the track, including related infrastructure components and equipment, in accordance with the ‘Statement of Work’ at Attachment 1.