Specifications include, but are not limited to: This work consists of furnishing all materials and removing the existing speed hump and reconstructingnew bituminous concrete speed hump and installing delineators at the location(s) shown on the Plans and/oras directed by the Engineer.Materials:The materials required for the reconstruction of the speed hump shall be bituminous concrete Type C andshall conform to the requirements of Section 401, and for permanent striping, requirements of Section 748of the Standard Specifications shall govern.The delineator blank shall be 6 x 12 (150 mm x 300 mm) aluminum plate, alloy 6061 T651 or 5052H32, 1/8 (3 mm) (min) in thickness with 1 1/2 (38 mm) radius corners, punched with two (2) 1/2 (11 mm)holes 2 (50 mm) from top and bottom, treated with a chromate conversion coating meeting ASTM B449.Reflector shall be covered on one side only with Type III High Intensity grade silver retroreflectivesheeting or other approved material with greater reflectivity. The breakaway delineator post shall becomposed of square steel tubes conforming to the notes and details shown on the Plans.Pavement striping shall be alkyd-thermoplastic