Specifications include, but are not limited to: A. Electrical Contractor To Provide: 1. Line Voltage and hook-up to all plumbing equipment (Division 22), HVAC equipment (Division 23), and building automation equipment (Division 25), including required manual safety switches with fuses/heaters of required size. 2. All conduit into accessible attic space for thermostats and sensors. 3. All lighting contactors, mechanically held with control relay, required coil voltage coordinated with controls contractor. 4. Junction Boxes (Standard One or Two Gang) required for controls contractor, and coordination with controls contractor. One TVSS power outlet at each energy management control panel located by project controls contractor.