This requirement is for 1 boiler replacement at building 550 using the same model, Lochinvar Armor Condensing Water Heater (AWH0800PM). (1 ea) Replacing the Lochinvar water heaters with the same model will remove the need for re-plumbing any of the supply and return lines, no need of re-wiring any of the electrical lines or thermostat wires and the vent stacks will fit perfectly with out any re-piping of the venting stacks saving the government time and money on changing the current system in order to work with a different brand of boilers.
Questions are due by 8 March 2023 at 12:00 PM MST
Attachments (3):
Attachment 1 – Provisions and Clauses
Attachment 2 – Salient Characteristics
Attachment 3 – Brand Name Justification Revised
AMENDMENT 1: 2/28/2023
The ">SAT" box was initially checked on "Attachment 3 - Brand Name Justification". This requirement is expected to be under SAT, therefore the box was unchecked. Please refer to "Attachment 3 - Brand Name Justification Revised".
AMENDMENT 2: 3/8/2023
The questions for this solicitation were due 8 March 2023 @ 12:00 MST. All questions received are attached. Please refer to "Attachment 4 - Questions"