This requirement is for 1 boiler replacement at building 1275 using the same model, Lochinvar Boiler (PBN0752-F9). (1 ea) Replacing the Lochinvar water heaters with the same model will remove the need for re-plumbing any of the supply and return lines, no need of re-wiring any of the electrical lines or thermostat wires and the vent stacks will fit perfectly with out any re-piping of the venting stacks saving the government time and money on changing the current system in order to work with a different brand of boilers.
Questions are due by 8 March 2023 at 12:00 PM Mountain Daylight Time
Attachments (3):
Attachment 1 – Provisions and Clauses
Attachment 2 – Salient Characteristics
Attachment 3 – Brand Name Justification Revised
AMENDMENT 1: 2/28/2023
The ">SAT" box was initially checked on "Attachment 3 - Brand Name Justification". This requirement is expected to be under SAT, therefore the box was unchecked. Please refer to "Attachment 3 - Brand Name Justification Revised".
AMENDMENT 2: 3/8/2023
The questions for this solicitation were due 8 March 2023 @ 12:00 MST. All questions received are attached. Please refer to "Attachment 4 - Questions"