Purpose of this amendment is to inform all interested parties NX drilling is acceptable. Extending the close date to 12/12/22 1400. No other changes to the solicitation.
Western Area Power Administration (WAPA) is designing a new switching station between existing Structures 37/3 and 37/4 of the Fort Thompson 230-kV double-circuit transmission line in Hand County that involves constructing switching station structures and two new double-circuit 230-kV steel monopole structures that will require geologic information. The new switching station and the transmission line are shown on Drawings RSH T001, RSH T8000, and FT-HU D T1006. The switching station structures will be steel poles and frames on reinforced-concrete foundations. See Statement of Work
The task includes the following:
a. Geologic mapping.
b. Subsurface investigation.
c. Laboratory testing.
d. Report.
e. Earth resistivity testing.