THIS IS AN INVITATION FOR BID (IFB) – PLANS AND SPECIFICATIONS ARE ATTACHED
This project is set aside for Small Businesses
Project Details: AZ/NV BR LCDO Hoover Dam Parking – Hoover Dam Parking Lots Rehab
PROJECT DESCRIPTION: This project proposes to accomplish pavement preservation for parking lots in the vicinity to the Hoover Dam. The project begins at the Clark County/Bureau of Reclamation boundary, approximately 750 feet west of the security checkpoint on the Nevada side and continues across the Hoover Dam, ending at the turnaround parking lot on the Arizona side. Timely completion of construction will be crucial to minimize parking lot closures and impact on visitors and traffic.
SCOPE OF THE WORK: The project proposes to accomplish pavement preservation for 17 parking lots along the Hoover Dam Access Road. The pavement preservation would include full depth patching, crack sealing, surface treatment, permanent pavement markings and permanent signing. The project also includes a slope failure repair on the mainline and rock lining under recently installed guardrail for erosion protection.
PRINCIPAL WORK ITEMS:
Estimated quantities of principal work items include:
48,500 square yards of fog seal
4.2 miles of cleaning and sealing of cracks 250 square yards of asphalt concrete pavement patch
425 cubic yards of placed riprap
13.5 miles of pavement markings 105 pavement marking symbols
65 sign systems
PROJECT MAGNITUDE: Between $700,000 and $2,000,000