Contractor performance includes, but is not limited to, the follow activiies required for replacement:
• Remove current tilt-a-way vehicle gate, gate pad, and pedestrian walk thru gate..
• Provide electrician to connect new gate, operators, etc. and dispose.
• Provide and install 1 each 22’ W X 7’ T aluminum twin track roller gate.
• Provide and install hydraulic drive 240 volt gate operator with heater, cold weather
package, and ice scrapers.
• Connect all current entry devices to new operator.
• Provide and install new pedestrian gate with new hinges and new cypher lock installed.
• Provide and install 2 each retroreflective photo eyes with heaters as required by UL 325
Standards.
• Provide electrician to connect power to new gate operator.