ABSTRACT OF OFFERS - Uploaded 09/12/2022
Uploaded - Agenda and Q&As from Pre-Bid Meeting
Uploaded - Sign-In Pre-bid Meeting W9128F22B0011 FR Bank Stablization
SOLICITATION for Fort Randall Bank Stabilizaiton - RM 886 and East Dude Ranch
Project Description:
This project is for the implementation of bank stabilization measures in Lyman and Charles Mix Counties SD adjacent to Lake Francis Case / Ft. Randall Dam Project
The work will consist of bank and slope protection of approximately 2,500 linear feet of Lake Francis Case on the site herein referred to as “FY22 Lake Francis Case RM 886 and 963, Lyman and Charles Mix County SD”. The work will consist of cutting, regrading, and compacting the existing bank to provide the proper slope for the placement geotextile fabric and rip rap stone. The contractor will be limited to the designated areas for operations.
The work is located on Lake Francis Case approximately 20 miles northwest of Pickstown SD and approximately 5 miles southwest of Oacoma SD. The exact location of the work will be provided by the Contracting Officer's Representative
All work and transport of materials associated with this project must comply with all federal, state, and local regulations.
Estimated Construction Costs (only include if applicable):
The estimated construction cost of this project is between $500,000 and $1,000,000.
NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237990: Other Heavy and Civil Engineering Construction, with a size standard for Small Business of $39.5M.
-This solicitation is restricted to Small Businesses-