The purpose of amendment 0003 is to extend the bid due date to 07 September 2022, update the bid due time to 10:00 AM and revise Spec Section 33 05 23 and a Drawing.
_____________________________________________________________________________
The purpose of amendment 0002 is to revise the Contract Duration, CLINs, Schedule of Prices, FAR Clauses: 5152.211-9000, 52.211-10 and 5152.211-9001, Spec Sections: 00 73 05, 01 20 00, 01 33 00 Submittal Register, 33 05 23 and Drawings/Plan Set.
_____________________________________________________________________________
The purpose of amendment 0001 is to establish a formal site visit on 16 August 2022, extend the bidder inquiry date to 19 August 2022 and extend the proposal due date to 02 September 2022.
_____________________________________________________________________________
Base Bid – Bob Shetler Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Directional Drilling, Trenching, Gate Valve Installation, Fire Hydrants, Water Meter Vault, Sanitary Sewer Piping, Sanitary Sewer Manhole, Sanitary Sewer Duplex Lift Station, Concrete Work, Asphalt Work, Granular Surfacing, Flowable Fill and Site Restoration.
Option A – Cherry Glen Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Water Meter Vault, Sanitary Sewer Lining, Sanitary Sewer, Sanitary Sewer Manhole Rehab, Lagoon Sludge Removal, Lagoon Piping & Manholes, Lagoon Earthwork, Lagoon Slope Protection Stone, Trail Pavement Replacement and Site Restoration.
Option B – Prairie Flower Campground includes Mobilization and Demobilization, Demolition, Direction Drilling, Gate Valves, Fire Hydrants, Water Meter Vaults, Sanitary Sewer, Sanitary Sewer Manhole Repair, Sanitary Sewer Duplex Lift Station and Site Restoration.