This acquisition is for Operations HUBZONE Multiple Award Task Order Contracts (MATOC) Only to Perform Design/Build, Operations
& Maintenance, and Construction Activities for Civil and Military Projects within the Great Lakes and Ohio River Division Mission Boundaries. This Request for Proposal is to update the electrical system at Newburg Locks and Dam as detailed in the scope of work, drawings, and specifications.
7/21/2022 - The Site Visit sign in sheet is hereby posted.
**************** Amendment 0001 ****************
a. Summary of changes for Drawings and Specifications attached.
b. Wage determination IN20220006, dated 7/29/2022, and IN20220003, dated 7/29/2022 is hereby updated and replaced in it's entirety.
c. The proposal due date is hereby extended from 1:00 PM Eastern Time on 8 August 2022 to 1:00 PM Eastern Time on 19 August 2022.
**************** Amendment 0001 *************
**************** Amendment 0002 ****************
a. Summary of changes for Drawings and Specifications attached.
b. Wage determination IN20220006, dated 8/5/2022 and IN20220003, dated 8/5/2022 is hereby
updated and replaced in it’s entirety.
The proposal due date is NOT extended as a result of this amendment.
**************** Amendment 0002 ****************
**************** Amendment 0003 ****************
a. Summary of changes for Drawings and Specifications attached.
b. Wage determination IN20220006, dated 8/19/2022, and IN20220003, dated 8/19/2022 is hereby updated and replaced in it’s entirety.
c. The proposal due date is hereby extended from 1:00 PM Eastern Time on 19 August 2022 to 1:00 PM Eastern Time 24 August 2022.
**************** Amendment 0003 ****************
**************** Amendment 0004 ****************
a. Summary of changes for Drawings and Specifications attached.
b. Wage determination IN20220006, dated 8/26/2022, is hereby updated and replaced in it’s entirety.
c. The proposal due date is hereby extended to 1:00 PM Eastern Time 26 September 2022.
**************** Amendment 0004 ****************