This project is to replace existing two single-vault toilets with one double-vault toilet at Iron Lake Campground. Work includes, but is not limited to, arranging to have existing toilets pumped empty prior to removal; removing and disposing of existing toilet buildings and vaults; excavating and preparing the sites for a new vault toilet; and backfilling and compacting around the new vault after placement. The contractor is responsible for coordinating toilet replacement with the pre-cast concrete toilet manufacturer. The manufacturer is reponsible for delivery, placement, and assembly of the new toilet.
Project Location
Site for toilet replacement is at the Iron Lake Campground in the Salmon-Challis National Forest. Material source is the Summit Pit near Williams Summit. See the Project Location Map for precise information on locations.