The following clarification information is being added:Â Â This is not the TJC (The Joint Commission) or NFPA required fire and smoke damper maintenance and testing, this is as stated in the SOW a contract to locate and document the existence of the fire and smoke dampers. The previously completed TJC/NFPA report is very out of date and numerous projects have been completed since the last report rendering any lists or compiled documents inaccurate and incomplete. Â Refer to SOW (excerpt below) for ICRA information, if the conditions in the SOW are followed, no containment booth should be required, IC risk assessment attached for record: Only two ceiling tiles at a time may be dislodged as part of the survey effort. No open ceiling tile/access panel or ladder may be left unattended. Do not open ceiling tiles in a patient space while patient is in the space. Coordinate with the COR when ceiling tiles need to be accessing in occupied inpatient spaces. Cover working surfaces with plastic in the following areas prior to opening ceiling tiles or access panels. B200 3W, Same Day Surgery 4N Chemo 5S Endo, 5N Dental B200E 1st Nuc Med, SPS 3rd OR/IR The following table displays the approximate square footages for the buildings and floors. BUILDING BASEMENT 1ST FLOOR 2ND FLOOR 3RD FLOOR 4TH FLOOR 5th FLOOR 6th FLOOR 7/8 FLOORS TOTAL SF Â Â Â Â Â Â Â Â Â Â B200E (G) 38,939 29,881 31,068 31,881 11,076 Â Â Â 142,845 B200 (G)19,644 (w/mri) 30933 22,741 20,206 20,215 19,990 12,515 6,499/ 1,520 154,263 B203 Â 6,127 6,127 5,054 Â Â Â Â 17,308 B204 1,012 16,606 15,624 962 Â Â Â Â 34,204 B205 Â 19,753 19,775 19,770 1,829 Â Â Â 61,127 B206 Â 20,918 19,377 19,531 1,829 Â Â Â 61,655 B207 Â 19,765 20,621 20,586 3,138 Â Â Â 64,110 B210 2,698 8,941 1,623 2,866 Â Â Â Â 16,128 B232 Â 14,866 3,655 Â Â Â Â Â 18,521 B248 Â 15,358 15,358 15,227 Â Â Â Â 45,943