*****
Additional Instructions for Proposal Submission: While the submission of proposals through PIEE is the preferred method and will be the only allowable method in the near future, any offeror who is having trouble submitting a proposal through PIEE may submit their proposal by either email or by requesting an upload code for DOD Safe.
If submitting by DOD Safe, submit requests to:
Scott Dwyer, Scott.Dwyer@usace.army.mil and
John Hickman, John.D.Hickman@usace.army.mil
In accordance with FAR 15.208, offerors are responsible for submitting proposals, and any revisions, and modifications, so as to reach the Government office designated in the solicitation by the time specified in the solicitation.
Due to delays in the transmission of electronic files, ensure you submit proposals with enough time to reach the Government office prior to the due date and time.
*****
Use Projnet Method Below To Receive All Solicitation Attachments:** Due to file size limitations associated with SAM.gov, RFP documents have been posted to a Projnet plan room at www.projnet.org using the quick add key PE886S-YVZJV4. On the Projnet login page, provide email address and enter the quick key in the key access section and check the box *I agree to the privacy and Security Notice*. Make sure the Managing Agency is USACE.
Construct a B-21 Mission Operations Planning Facility (MPF) and a B-21 Field Detachment Training Facility (FTD) on a combined site at EAFB, SD. The MPF will provide +/- 47,113 SF of secure operations planning space in support of B-21 operations at EAFB. The FTD will provide +/- 57,328 SF of secure maintenance training and classroom space in support of B-21operations at EAFB and Air Force-wide. The projects will include multiple spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705(ICD/ICS 705). See 01 14 00 WORK RESTRICTIONS for additional information and requirements. The projects will include associated paving, site features, utilities, and infrastructure for operations planning for the emerging B-21 airframe. The project may also include bid options for fixtures, furnishings, and equipment (FFE), intrusion detection systems(IDS), access control systems (ACS), uninterrupted power supply (UPS), and closed-circuit television (CCTV) systems.