Specifications include, but are not limited to: A. Base Bid: The Base Bid price is to include Scope of Work items as described in Article 2.02A, which are shown in the Drawings and Specifications that have known quantities. It is the responsibility of the Contractor to ensure all Scope of Work items required by the Contract Documents are included in the Base Bid. 1. Painting on the 1 st floor and second 2 nd floor of the Main Capitol Building as indicated on the contract drawings, in accordance with Section 09 03 94 “Historic Treatment of Decorative Painting” 2. Perform repairs on historic interior plaster on the 1 st floor and 2 nd floors, in accordance with Section 09 03 20 “Historic Treatment of Plaster.” B. Unit Price 1: Plaster Repair 1. Locations of damaged plaster within the Capitol require removal or repair of the plaster in accordance with Section 09 03 20 “Historic Treatment of Plaster.” 2. Contractor shall include a Unit Price item, expressed in terms of square foot of repair and patching on wall or ceiling surfaces. C. Unit Price 2: Decorative Plaster Repair 1. Locations of damaged formed plaster, molding, rosettes with the Capitol that require removal or repair in accordance with Section 09 03 20 “Treatment of Historic Plaster.” 2. Contractor shall include a Unit Price item, expressed in terms of square foot of repair. D. Unit Price 3: Painting 1. Locations of areas to paint in accordance with Section 09 03 94 “Historic Treatment of Decorative Painting.” 2. Contractor shall include a Unit Price item, expressed in units of square foot of painting. E. Unit Price 4: Decorative Paint 1. Locations of areas of mosaics or mural to be repaired in accordance with Section 09 03 94 “Historic Treatment of Decorative Painting.” 2. Contractor shall include a unit price item, expressed in units of square foot of painting.