All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: 1 Adair-Contractor is required to provide all materials, equipment and labor for the removal and replacement of overhead door #6 and 2" door track as per plans/specifications. This includes the disposal of all debris off site. 2 Red Oak-Contractor is required to provide all materials, equipment and labor for the removal and replacement of overhead door #5 and 3" door track as per plans/specifications. This includes the disposal of all debris off site. 3 Greenfield-Contractor is required to provide all materials, equipment and labor for the removal and replacement of overhead door on Brine Building and 3" door track on clear polycarbonate with aluminum frame as per plans/specifications. This includes the disposal of all debris off site. 4 Neola-Contractor is required to provide all materials, equipment and labor for the removal and replacement of overhead door #14 and 2" door track as per plans/specifications. This includes the disposal of all debris off site. 5 Missouri Valley-Contractor is required to provide all materials, equipment and labor for the removal and replacement of overhead door #17 and 2" door track as per plans/specifications. This includes the disposal of all debris off site.