Specifications include, but are not limited to: 1. Daily logs, due at the end of each workday.2. Project Photo documentation of the following:a. construction site condition prior to mobilizationb. well drilling operationc.well screen installationd. well pump installatione. waterline installationf.well developmentg. well caph. well name platei.final gradingj.in-home water pressure systemk.construction site after final grading/cleanup and after demobilization3. Copy of:a. The well logsb. Well test pump resultsc.Analytical water test resultsd. As-built drawings: including swing-ties of the well to two permanent above groundstructures.Septic System Installation Deliverables:1. Daily logs, due at the end of each workday.2. Project Photo documentation of the following:a.Construction site condition prior to mobilization and after demobilizationb. Placement of septic tank, and lift station (when required) including pump typec.Placement of beddingd. Installation of the infiltratorse. Backfill processf.Grading processg. Construction site after final site grading/cleanuph. Each tank abandonment and disposa