Specifications include, but are not limited to: Eagle Mountain City is seeking qualified consultation for upgrading the pumping capacity of an existing city well. In an effort to increase the City’s ability to provide water to our community, the city desires to upgrade an existing well. When this well was originally constructed, Rocky Mountain Power did not have sufficient capacity in this area to provide for optimum well performance. At the time of the original construction of well 5, only 480V 3 phase was available so the well was designed to with a lower horsepower motor. Since that time, however, upgrades have been made to their system to provide 12,470 in that area, which would accommodate 4160 at the well site with a transformer.