Specifications include, but are not limited to: The HCTC Library Commons renovation project primarily consists of the approximately 1,700 square feet selective demolition and renovation of the existing Circulation, Work Area and Tutoring Lab and conversion into a Success Work Zone, Library Reservations, subdividing the existing Tutoring Lab into a Secure Area and Flex Office Space, as well as the relocation and reconfiguration of existing modular glass walls for a new Success Coach and Tutoring Offices on the second floor of the J. Marvin Jolly Classroom Center in Hazard, Kentucky. A new circulation desk has already been installed recently and should be protected. Finishes and door hardware are to match all existing finishes and facility standards. Finishes include painted gypsum board, acoustic ceiling tile with grid, vinyl composite tile, rubber base and two (2) new solid core wood veneer doors within hollow metal frames (with sidelites). New and relocated existing diffusers to tie into existing ductwork. New lighting, relocated existing lighting, and power to room fit up. Relocated sprinkler heads to tie into existing lines.