Specifications include, but are not limited to: One contractor to complete the scope of construction of all three elements (pump track, jump lines, and skate park) to ensure that the unified design for all elements of this project are properly captured in the construction. Two of the main elements are a combined skatepark and pump track. · Construction of all items as specified in the attached design documents. This includes construction of the asphalt pump track that meets the Union Cycliste Internationale (UCI) specifications and certification as designed and constructed by Velosolutions. · All labor, construction project management, supplies, tools, materials, and equipment required per scope of work · Site staking and layout · Cutting and shaping grades within skatepark footprint · Installation of rebar · Install and finish shotcrete · Concrete flatwork · Concrete ledges, steps, and turndown walls · Expansion joints, saw cuts and cold joints · Coping, edgings, rails · Park sealing · Fine grading · French drains · Seeding · Sod in pump track areas (bid to include an add alternative of a Progressive Permeable Pavement a rubberized asphalt in the place of sod) · Drain cover and pipe installation (to be connected by others) DB to provide Connection/GC to provide stub out for connection. · Required Certification: · ACI Certification Shotcrete Construction Contractor and all subcontractors are required to have a valid City of Sandy business license and pay all applicable Transit taxes prior to beginning project work. The following with be the responsibility of the City and/or General Contractor: · Conduct utility locates prior to any construction · Obtain a City of Sandy demolition permit and building permit