Specifications include, but are not limited to: • Bid Schedule A – Electrical Improvements Consisting of: o Demolition of the existing electrical vault building and abandoned well, including hazardous abatement o Removal of the existing emergency back-up generator o Removal of the existing rotating beacon and tower, including hazardous abatement o Installation of airfield electrical equipment in existing room within 2000 Airport Road building, using existing PG&E service o Extension of airfield electrical systems to the proposed electrical room o Installation of lighting control equipment via radio connection between Air Traffic Control Tower (ATCT) and proposed electrical room o Connection of existing 2000 Airport Road building emergency back-up generator to proposed electrical room o Relocation of the solar connection from the existing electrical vault building to a new circuit breaker in the 2000 Airport Road building o Installation of new roof-mounted rotating beacon on the 2000 Airport Road building o Relocation of existing Airport access gate (Gate 4) to new location north of Gate 5, and extension of electrical infrastructure to the new gate location • Bid Schedule B – Sanitary Sewer Improvements Consisting of: o Abandonment of existing sewer pipelines and sewer manhole structures o Installation of 8-inch sewer main pipeline, precast sewer manhole structures, and stub outs for future laterals • Bid Schedule C – Terminal Building Demolition Consisting of: o Installation of temporary Air Operations Area (AOA) fence to replace existing Airport Terminal Building o Demolition of existing Airport Terminal Building, including hazardous abatement