Specifications include, but are not limited to: A. Bid Package #01 – General Construction: Trade Contractor shall include all of the following, but not limited to, as part of the contract: 1. This contractor shall be responsible for the demolition and construction of a new intel operations room, office space and corridor as outlined in the contract documents. This includes but is not limited to ceiling modifications, wall demolition as required and painting. 2. Contractor shall be responsible for the disassembly of the existing office furniture walls and turnover to Owner. 3. This contractor shall remove and salvage existing wood doors for relocation. Contractor shall field verify hinge and strike locations on the existing doors for new frames 4. This contractor shall provide and install new frames and hardware for existing doors to remain. The contractor is responsible to make sure all new hardware works with existing doors. 5. This contractor shall protect existing items which includes but is not limited to; equipment, plumbing fixtures, carpet and server room equipment during demolition and construction. 6. This contractor shall demolish the existing cloud ceiling as outlined in the contract documents. Where specified, salvage light fixtures, diffusers etc for reinstallation. 7. This contractor shall be responsible for storage and protection of all salvage items. 8. This contractor shall patch the floor with matching carpet as needed from owner furnished attic stock as outlined in the contract documents. 9. This contractor shall be responsible for providing new wall base as needed to create uniform finish conditions. 10. This contract shall provide and install surface mounted plywood, painted black, as outlined in the contract documents. Contractor shall coordinate the final monitor location with the owner. B. Bid Package #02 – Electrical: Trade Contractor shall include all of the following, but not limited to, as part of the contract: 1. This contractor shall be responsible for all electrical and low voltage scope per the contract documents. 2. This contractor shall be responsible for all electrical and low voltage disconnects and removals prior to the start of demolition. This shall include, but not be limited to, electrical and low voltage in walls, ceilings, and furniture walls. 3. This contractor is responsible for the removal of existing electrical systems including conduit, boxes, wire, cable, supports, wiring devices, safety switches, fire alarm equipment, speakers, telephone outlets and light fixtures. See electrical drawings 4. Contractor shall provide and install end caps at existing luminaires not to be removed or to be relocated. 5. This contractor shall be responsible for removing and salvaging existing in ceiling devices, including but not limited, to light fixtures, existing signs and other electrical or communication devices. 6. This contractor shall connect relocated luminaries to existing lighting circuit and controls currently serving the office, intel ops room, and corridor area as outlined in the contract documents 7. This contractor shall provide two new light switches in the new intel ops room. One switch controls the front row of lights with the second switch controlling the remaining lights. 8. This contractor shall provide and install new electrical and data receptacles at locations identified in the contract documents. 9. Power connection to VAV 509A shall be completed by this bid package. VAV procurement and installation by bid package #03. 1. This contractor shall be responsible for obtaining an electrical permit and providing a copy to the Construction Manager.