Specifications include, but are not limited to: Installing approximately 3,200 feet of 8-inch C-900 culinary water pipe in the Alpine Highway (100 East), beginning at the intersection of 100 North and running 1,500 feet to 300 North and beginning at 500 North and running 1700 feet to 740 North. Work includes installing new culinary service connections and fire hydrants within the Project area. Existing culinary water lines must be reconnected to the new 8-inch C-900 culinary water pipe. Work to be performed includes valves, fittings, meters, excavation, backfilling, curb and gutter, road reconstruction and asphalt repaving. Work also includes replacing an 8-inch SDR35 PVC sewer pipe for approximately 980 feet between 600 North and 700 North. 1 Mobilization, Bonding, and Permits 1 LS; 2 Traffic Control, Maintaining Temporary Roadway, and Dust Control 1 LS; 3 Public Information and Relations 1 LS; 4 Furnish and Install 8-inch C-900 3380 LF; 5 Furnish and Install 8-inch C-900 with Flowable Fill 580 LF; 6 Furnish and Install 12-inch C-900 200 LF; 7 Furnish and Install 12-inch C-900 with Flowable Fill 175 LF; 8 Furnish and Install 12X12 Flanged Tee 3 EA; 9 Furnish and Install 8X8 Flanged Tee 4 EA; 10 Furnish and Install 8X8 Flanged Cross 2 EA; 11 Furnish and Install 12X8 Flanged Reducer 2 EA; 12 Furnish and Install 12” DI Bend 4 EA;