Specifications include, but are not limited to: STOCKPILE SITE: #1 LINCOLN PIT ROUTE: SECONDARY 229 MILEPOST: 7.287 MMS STOCKPILE NUMBER: 012151 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 3,000 tons or 2,000 cubic yards of sanding material. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff. STOCKPILE SITE: #2 RIMINI MAINTENANCE YARD ROUTE: US-12 MILEPOST: 33.188 MMS STOCKPILE NUMBER: 012129 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 4,125 tons or 2,750 cubic yards of sanding material. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff. STOCKPILE SITE: #3 BOULDER SECTION YARD ROUTE: MT-69 MILEPOST: 38.054 MMS STOCKPILE NUMBER: 012119 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 3,000 tons or 2,000 cubic yards of sanding material. Stockpile material to facilitate water runoff.