Specifications include, but are not limited to: STOCKPILE SITE #1: LINCOLN YARD ROUTE: MT-200 MILEPOST: 68.37 MMS STOCKPILE NUMBER: 013108 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 3,000 tons or 2,000 cubic yards of sanding material. Add 10% contractor furnished salt by weight to 3,000 tons of sanding material or add 10% contractor furnished salt by weight to 2,000 cubic yards of sanding material. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff. STOCKPILE SITE #2: ROGERS PASS YARD ROUTE: MT-200 MILEPOST: 98.07 MMS STOCKPILE NUMBER: 013107 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 5,000 tons or 3,333 cubic yards of sanding material. Add 10% contractor furnished salt by weight to 3,000 tons of sanding material or add 10% contractor furnished salt by weight to 2,000 cubic yards of sanding material. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff.