Specifications include, but are not limited to: This project consists of a chip seal on US 93 from milepost LN 25.00 to 39.40 in Lincoln County. The road in the project area is a principal arterial with one 12-foot lane per direction and minimal shoulders for both directions. The posted speed limit is 70 miles per hour (mph) and is reduced to 50 mph from milepost LN 38.2 to 39.4. Traffic control will consist of single lane closures which will be performed utilizing flaggers and a pilot car. 1 SQYD 10,864.000 REMOVAL OF BITUMINOUS SURFACE (COLD MILLING); 2 TON 12,160.000 SHOULDERING MATERIAL; 3 TON 1,781.000 PLANTMIX SURFACING (TYPE 2) (WET); 4 MILE 28.400 MILLED RUMBLE STRIPS; 5 TON 120.000 FOG SEAL; 6 TON 10.000 SAND BLOTTER; 7 TON 478.000 EMULSIFIED ASPHALT, TYPE PMRE-H; 8 CUYD 2,396.000 SCREENINGS, 3/8-INCH; 9 EACH 246.000 GUIDE POSTS (FLEXIBLE); 10 EACH 42.000 OBJECT MARKERS, TYPE 3; 11 FA 1.000 UNIFORMED TRAFFIC CONTROL OFFICER; 12 DAY 35.000 TRAFFIC CONTROL SUPERVISOR;