Specifications include, but are not limited to: #1 Provide SBS cap sheet repair over existing roof on Roof Area E. Refer to notes on Drawing page A0.3. #2 Provide SBS cap sheet repair over existing roof on Roof Area F. Refer to notes on Drawing page A0.3. #3 Roof Areas A, B & C: Remove and replace existing shingle roof with new standing seam metal roof system, gutters, and downspouts. Refer to Section 07 61 13. #4 Wrestling Bldg: Remove existing claddings/sheathing and provide kraft faced fiberglass batt insulation to meet minimum R-19. Refer to Section 07 21 00. #5 Wrestling Bldg: Provide plywood sheathing over new wall insulation. Refer to Section 06 10 00. #6 Provide weather resistant barrier (WRB) to walls of Wrestling Building. Refer to Section 07 27 00. #7 Provide pre-finished metal cladding on furring to walls of Wrestling Building. Refer to Section 07 41 00. #8 Provide fiber cement cladding on furring to walls of Wrestling Building. Refer to Section 07 46 46. #9 Provide paint related to fiber cement cladding. Refer to Section 09 91 13