All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The Project consists of the design and construction of curb ramps at approximately 247 locations along US 60 in Westmoreland, CO 60/1, CO 7, and CO 7/46 in Spring Valley, US 60 in West Huntington, US 60 and WV 527 in Huntington to ensure ADA compliance. DOH intends to enter into a contract, which shall include but is not limited to: • Survey Services – no mapping will be supplied by the DOH • Right of Way Acquisition – All necessary plans and acquisition of right of way to construct the Project if deemed necessary • Project Services – preparation of construction plans as detailed in the Project Scope and shall include but are not limited to Design and Project Management; • Utility Coordination and Utility Relocation Services