Specifications include, but are not limited to: At KCIW's MSU dorm building, remove existing steam boiler and steam radiator system complete. Provide new packaged gas-electric rooftop units on grade with new supply and return ductwork to heat/cool the building. Provide new smoke control system for the building including exhaust fan, control dampers, smoke detectors, firefighter control station, and integration with building's existing central fire alarm system. Upgrade building's normal power electrical service to accommodate the new HVAC equipment. At the dayroom trailer, adjacent to MSU dorm building, remove two Bard window a/c units, and baseboard heaters. Provide new packaged gas-electric unit on grade and reconnect to existing supply and return ductwork. Although MSU Dorm & Dayroom are outside KCIW's main perimeter security fence, contractor is still subject to all of DOC/KCIW's contractor rules as outlined in the Special Conditions.