Specifications include, but are not limited to: • Review the recommendations of the City’s Wastewater Collection System Master Plan. For access to this document, email a request to brandy.davis@rexburg.org. • Design a new lift station to be located at Riverside Park. The initial capacity is anticipated to be 1,000 gpm, but designed to expand to a future master plan peak inflow of 2,330 gpm. • The design will include provisions to control corrosion of the collection system line and manholes between Sugar City and Rexburg and corrosion and odor control at the new lift station. • The scope may be expanded to include construction administration, design of other wastewater collection system improvements, and other related engineering services.