Specifications include, but are not limited to: Phase 1: Pre-Construction Services. The first phase of the work will occur prior to finalization of “Issued for Construction” Contract Documents. Briefly, Pre-Construction Services include, but are not limited to, participating in design meetings; value engineering workshops/meetings; installation/maintenance means and methods discussions; construction cost estimating and cost control strategizing; construction staging, construction access, schedule development including construction sequencing; permitting assistance; design reviews with comments for the 30%, 60%, 90%, 100% design reviews; constructability reviews; and development of a Contractor Diversity & Inclusion Plan (CDIP). In addition, the CM/GC will help develop the construction scope of work, construction schedules, and the GMP for the construction phase(s) of the work. Phase 1 work will be performed on an Hourly Rate, Not to Exceed basis, up to the Contract amount. Scope for this work is further detailed below. Phase 2: Construction Services. Following successful negotiation of the overall project GMP, a contract for construction services will be issued. This final phase of the work includes construction, construction management, and completion of all remaining construction work elements within the required schedule on a Fixed Fee on the Reimbursable Cost of Work. For Phase 1, the successful PROPOSER will enter a contract to become the CM/GC and provide Pre-Construction Services during the design phase of the Project. Upon completion of the 90% design milestone documents, the CM/GC will be asked to provide a Guaranteed Maximum Price and to act as the CM/GC for Phase 2 and assume the risk of delivering the remainder of the Project on schedule at or under the GMP. Acceptance by the OWNER of the GMP, along with providing the Notice to Proceed, the second phase to complete construction services for all construction work on the Project will be initiated. Major elements of anticipated construction may include but are not limited to the following, (details provided are subject to change as design progresses): Dam 1 Slide Gates: Removal of three (3) existing slide gates and operational equipment. Installation of three (3) new slide gates and operating equipment on top of Dam No. 1. Repair of concrete stairs and surfaces. New equipment and hoists will need to be installed while still providing water downstream to the Dam No. 2 Reservoir.