Specifications include, but are not limited to: Springville City will accept bids for the Burt Springs Renovation project - rehab of the existing Bur Springs collection system. The work is comprised of the rehabilitation of the existing Burt Springs collection system consisting of new collection piping, concrete junction box, concrete spring box, bypass/overflow pipe, chain link fencing, concrete plug on existing collection pipe, and other appurtenances for a complete and operable spring collection system. The work also includes the construction of a new drinking water pump station consisting of a masonry block structure with pitched roof; furnishing and installing a 200 HP vertical turbine pump and a 40 HP vertical turbine pump, pump cans, pump motors, and VFD starters; pump station piping, bladder style surge tank, flow meters, and valves, drain piping, chlorination facilities, HVAC, electrical, controls; new SCADA antenna, relocate existing radio antenna; relocation of aeration system panels and 2-inch diameter PVC piping, concrete flow meter vault, overflow structure; concrete sidewalks, concrete curb and gutter, paving, final site grading and restoration, exterior piping including a 16-inch diameter waterline with connection to the existing 12-inch diameter waterline; and all other associated items and appurtenant work.