Specifications include, but are not limited to: 1) Furnish the following items new to OEM or equal specifications: • Tension bearing • Intermediate bearing • Transition bearing • Suction bell bearing • Impeller wear ring • Coupling nuts • All gaskets and fasteners • All proper bearings • Provide all required fittings and hardware 2) Transportation to the rebuild facility and back to the City site for installation is the contractor’s responsibility. 3) Disassemble pump completely, clean and bead blast all components and inspect pump. 4) Remove the existing stainless steel suction bell. Inspect for wear and ensure it is fabricated the same way to existing bell standards. Remove bearing and inspect bearing seat, ensure it is to OEM standards, install new bearing that is to OEM standards or equivalent. Machine bearing bore and bell seat so they are within acceptable OEM tolerance if necessary. Replace any parts that are not to OEM specifications. 5) Remove bowl assembly, remove all bearings and bowl ring. Clean and inspect, chase threaded location. Install new bearing that fits OEM specifications or equivalent. Set up and machine new bearing bore to OEM specifications. Machine new and replace bowl wear ring to OEM specifications. Replace any items that are not to OEM specifications.